Low Voltage for Construction and Tenant Improvements
On a build out, low voltage is the trade that gets scheduled last and blamed first. The fix is sequencing: closet location and pathways decided during design, rough-in after framing, overhead runs before ceiling tile, terminations after paint, and testing before occupancy.
We work as the low voltage sub on tenant improvements and ground-up commercial projects across the valley, coordinating with the GC, the electrician, and the ceiling and furniture trades so cabling never becomes the reason drywall waits.
Cabling built for construction & tenant improvements
Design-phase coordination
Closet location, tray and sleeve placement, and firestop planned with the GC before walls close, which is when those decisions are cheap.
Rough-in and pull
Boxes, pathways, and cable in the walls at the right point in the framing sequence, inspected and photographed before drywall.
Finish and closet build
Terminations, faceplates, rack build, and dressing after finishes, matched to the documented labeling scheme.
Test, verify, and close out
Every port tested and verified with results delivered in the closeout package, ready for the punch walk.
The service lines this work draws on.
Commercial Network Cabling
Cat6, Cat6A, and fiber backbone runs designed, installed, labeled, and verified to standard.
View details →Office Data Cabling
Workstation drops, conference room feeds, and a rack you are not embarrassed to open in front of a client.
View details →Network Equipment & IT Installation
Racks, switches, and IT gear mounted, power planned, and every cable dressed so the closet stays serviceable.
View details →Construction & Tenant Improvements questions we hear first
When should low voltage get involved in the project?
During design, before drywall is even on the schedule. The expensive cabling mistakes on a TI are all sequencing mistakes, and every one of them is avoidable in a thirty minute coordination meeting.
Do you carry the insurance and paperwork GCs require?
Yes. We are a licensed, bonded, and insured Arizona cable contractor and we handle the certificates, badging, and safety documentation general contractors and property managers ask for.
Tell us what the building needs.
A short on-site visit turns a vague budget number into a fixed written estimate. Designed with future growth in mind, allowing you to build in stages as your needs evolve.